The Impact Of Communication On Project Performance In Construction Projects
DOI:
https://doi.org/10.70134/ircee.v1i1.45Keywords:
Communication, Bridge Construction Projects, Project Performance, Digital Tools, StakeholdersAbstract
Effective communication is a critical factor influencing the success of construction projects, impacting project performance in terms of time, cost, and quality. This study investigates the relationship between communication practices and project outcomes in the construction industry. Utilizing a mixed-methods approach, quantitative data were collected through surveys with project stakeholders, while qualitative insights were obtained from interviews with experienced construction professionals. Results indicate that projects with structured and clear communication practices demonstrate improved performance, reduced delays, and cost efficiency. Key barriers identified include language differences, inconsistent information flow, and delayed updates. The study highlights the importance of adopting digital communication tools and standardized protocols to enhance communication effectiveness. These findings underscore the need for strategic communication management to achieve optimal project performance
Downloads
References
Aftab, H. M., Ismail, A. R., & Mohamad, N. A. (2014). Analysis of communication challenges in construction projects in Malaysia. Procedia - Social and Behavioral Sciences, 129, 797–803. https://doi.org/10.1016/j.sbspro.2014.03.358
Alhammadi, Y., & Alshibani, A. (2020). Enhancing construction project performance by managing communication risks. Engineering, Construction and Architectural Management, 27(2), 511–530. https://doi.org/10.1108/ECAM-07-2018-0275
Alotaibi, Y., Sutrisna, M., & Chong, H. Y. (2016). Improving communication in construction project management. Journal of Construction Engineering and Management, 142(10), 04016042. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001168
Amor, R., & Faraj, I. (2001). Miscommunication issues in construction. Automation in Construction, 10(2), 239–246. https://doi.org/10.1016/S0926-5805(00)00052-4
Anantatmula, V. S. (2010). Project manager leadership role in improving project performance. Engineering Management Journal, 22(1), 13–22. https://doi.org/10.1080/10429247.2010.11431849
Arditi, D., & Gunaydin, H. M. (1998). Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), 194–203. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(194)
Barrett, D. J. (2006). Leadership communication. McGraw-Hill.
Barrett, P., & Sutrisna, M. (2009). Methodological strategies to gain insights into effective communication within construction project teams. Journal of Construction Engineering and Management, 135(12), 1301–1308. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000106
Bate'e, E. K., Laoli, E. S., Zebua, D., Halawa, I. H., Ziliwu, P. I. A. P., Halawa, S. J., & Lase, F. (2024). Aplikasi teknik statistik dalam evaluasi kinerja material konstruksi di berbagai kondisi lingkungan. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(1), 48–56. https://doi.org/10.70134/identik.v1i1.244
Bond-Barnard, T. J., Steyn, H., & Fabris-Rotelli, I. (2013). The impact of a call centre on communication in a program and project environment. International Journal of Project Management, 31(7), 1006–1016. https://doi.org/10.1016/j.ijproman.2013.04.007
Chan, A. P., Scott, D., & Lam, E. W. (2002). Framework of success criteria for design/build projects. Journal of Management in Engineering, 18(3), 120–128. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120)
Chen, P., Luo, H., & Gong, M. (2014). Impact of communication on construction project performance. Construction Management and Economics, 32(1), 96–108. https://doi.org/10.1080/01446193.2014.944986
Chiu, M. L. (2002). An organizational view of design communication in design collaboration. Design Studies, 23(2), 187–210. https://doi.org/10.1016/S0142-694X(01)00023-7
Choudhry, R. M., & Iqbal, K. (2013). Identification of risk management system in construction industry in Pakistan. Journal of Management in Engineering, 29(1), 42–49. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000118
Daeli, J. R., Giawa, J. F. K., Mendrofa, K. B., Zebua, D., Ndruru, A., Ziliwu, I. S., & Zebua, C. (2024). Penerapan metode statistik dalam evaluasi kinerja jembatan dengan menggunakan data pemeliharaan dan inspeksi. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(1), 57–65. https://doi.org/10.70134/identik.v1i1.245
Dainty, A. R., Moore, D., & Murray, M. (2006). Communication in construction: Theory and practice. Taylor & Francis.
Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189–201. https://doi.org/10.1016/j.ijproman.2013.02.006
Eadie, R., & Perera, S. (2017). Analysis of BIM use for communication between stakeholders in the construction industry. International Journal of Project Management, 35(3), 570–578. https://doi.org/10.1016/j.ijproman.2017.01.001
Emmitt, S., & Gorse, C. (2007). Communication in construction teams. Taylor & Francis.
Femi, A. F. (2014). The impact of communication on workers’ performance in selected organizations in Lagos State, Nigeria. IOSR Journal of Humanities and Social Science, 19(8), 75–82. https://doi.org/10.9790/0837-19837582
Fisher, C., & Lovell, A. (2009). Business ethics and values: Individual, corporate, and international perspectives. Pearson Education.
Flanagan, R., & Norman, G. (1993). Risk management and construction. Blackwell Science.
Freeman, R. E. (1984). Strategic management: A stakeholder approach. Cambridge University Press.
Gamil, Y., & Rahman, I. A. (2017). Identification of causes and effects of poor communication in construction industry. Procedia Engineering, 196, 449–457. https://doi.org/10.1016/j.proeng.2017.07.222
Gea, P. M., Dohare, G. A., Zebua, M. K., Zebua, A. K., Zebua, D., & Ndruru, R. J. (2024). Pengaruh penambahan serat baja terhadap kuat tekan beton pada berbagai tingkat kepadatan. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(1), 66–73. https://doi.org/10.70134/identik.v1i1.246
Gligoric, A., & Hocevar, M. (2018). Project communication management in Serbian construction industry. Proceedings of the 16th International Conference on Civil and Construction Engineering, 23(4), 120–134. https://doi.org/10.1109/ICCCE.2018.8605267
Hackman, J. R., & Wageman, R. (2005). A theory of team coaching. Academy of Management Review, 30(2), 269–287. https://doi.org/10.5465/amr.2005.16387885
Hamedoni, H., Daeli, S. D., Zalukhu, M. H., & Zebua, D. (2024). Strategi pengelolaan risiko dalam konstruksi gedung tahan gempa di daerah rawan bencana. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(2), 1-10. https://doi.org/10.70134/identik.v1i2.35
Jefferies, M., Brewer, G., & Gajendran, T. (2016). Using a project alliance approach to model multi-stakeholder communication. Engineering, Construction and Architectural Management, 23(3), 438–455. https://doi.org/10.1108/ECAM-04-2014-0052
Jelena, M., & Marko, S. (2018). Impact of communication on project performance: A construction industry perspective. International Journal of Project Management, 36(4), 576–587. https://doi.org/10.1016/j.ijproman.2018.01.005
Karlsen, J. T. (2002). Project stakeholder management. Engineering Management Journal, 14(4), 19–24. https://doi.org/10.1080/10429247.2002.11415180
Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Kolago, D. P., & Zebua, D. (2023). Analisa beban pendinginan dalam perencanaan bangunan gedung. Jurnal Penelitian Jalan dan Jembatan, 3(2). https://doi.org/10.59900/ptrkjj.v3i2.171
Kwon, O., & Kang, J. (2017). Analysis of factors influencing project success in the construction industry. Journal of Management in Engineering, 33(3), 04017004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000508
Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process for contractors. Journal of Construction Engineering and Management, 137(4), 248–258. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000288
Ling, F. Y. Y., Ong, S. Y., Ke, Y., Wang, S., & Zou, P. X. W. (2011). Drivers of communication satisfaction in construction project teams. Journal of Construction Engineering and Management, 137(5), 317–329. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000305
Love, P. E., & Irani, Z. (2003). A project management quality cost information system for the construction industry. Information & Management, 40(7), 649–661. https://doi.org/10.1016/S0378-7206(02)00091-8
Maki, D., & Sullivan, M. (2014). Effective communication strategies for project success. Project Management Institute.
McCord, S. A., & Stone, W. B. (2018). Managing cultural differences in construction projects. Journal of Professional Issues in Engineering Education and Practice, 144(3), 04018003. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000388
Mills, A. (2001). A systematic approach to risk management for construction. Structural Survey, 19(5), 245–252. https://doi.org/10.1108/02630800110412615
Mosley, D. C., & Pietri, P. H. (2015). Supervision: Concepts and practices of management. Cengage Learning.
Müller, R., & Turner, J. R. (2010). Project Communication Theory: An empirical study of the impact of project managers' communication competence. International Journal of Project Management, 28(1), 51–60. https://doi.org/10.1016/j.ijproman.2009.05.002
Olander, S. (2007). Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(3), 277–287. https://doi.org/10.1080/01446190600879125
Paroipo, W. T., Cahyono, M. S. D., & Zebua, D. (2022). Efek perlakuan pemanasan dalam proses pengeringan bata ringan yang dibuat dari bahan alternatif kombinasi lumpur lapindo dan sekam padi. Jurnal Penelitian Jalan dan Jembatan, 2(2), 9-13. https://doi.org/10.59900/ptrkjj.v2i2.82
Rahman, M. M., & Kumaraswamy, M. M. (2004). Potential for implementing relational contracting and joint risk management. Journal of Management in Engineering, 20(4), 178–189. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(178)
Ridwan, D., Zebua, D., & Solihin. (2023). Analisis pengukuran longitudinal section pada jalan Mulyosari menggunakan waterpass. Jurnal Penelitian Jalan dan Jembatan, 3(2). https://doi.org/10.59900/ptrkjj.v3i2.169
Teras, D., Zebua, D., & Fiya. (2023). Proses penapisan terkait amdal pada pembangunan jalan di Desa Bangun Harja. Jurnal Penelitian Jalan dan Jembatan, 3(2). https://doi.org/10.59900/ptrkjj.v3i2.170
Tjahjono, B., Zebua, D., & Mita, V. (2023). Analisis kajian literatur risiko keselamatan dan kesehatan kerja (K3) dalam pembangunan gedung bertingkat di Indonesia. Jurnal Jurnal Penelitian Jalan dan Jembatan, 3(2). https://doi.org/10.59900/ptrkjj.v3i2.168
Tjahjono, B., Zebua, D., & Rusnani. (2023). Perbandingan nilai momen pada SpColumn dengan hasil eksperimen. Jurnal Penelitian Jalan dan Jembatan, 3(1), 1-7. https://doi.org/10.59900/ptrkjj.v3i1.130
Wibowo, L. S. B., & Zebua, D. (2021). Analisis Pengaruh Lokasi Dinding Geser Terhadap Pergeseran Lateral Bangunan Bertingkat Beton Bertulang 5 Lantai. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 04(01), 16–20. https://doi.org/10.25139/jprs.v4i1.3490
Zalukhu, A. E., Zebua, D., Lase, C. A., Harefa, F. N., Zebua, F. D., & Loi, A. (2024). Analisis faktor penyebab pembengkakan biaya pada proyek konstruksi. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(1), 38–47. https://doi.org/10.70134/identik.v1i1.242
Zebua, D. (2022). Analisis pushover pada struktur bangunan bertingkat beton bertulang 10 lantai (Master's thesis, Universitas Narotama). Universitas Narotama Repository. http://repository.narotama.ac.id/id/eprint/1962
Zebua, D. (2023). Analisis displacement struktur beton bertulang pada gedung rumah sakit. Jurnal Penelitian Jalan dan Jembatan, 3(1), 20-25. https://doi.org/10.59900/ptrkjj.v3i1.133
Zebua, D., & Hasanah, R. (2023). Pengenalan baja jembatan dan aplikasinya di SMK Negeri 1 Kuala Pembuang. Jurnal Pengabdian Kepada Masyarakat, 1(01). https://doi.org/10.59900/pkmtrkjj.v1i01.116
Zebua, D., & Koespiadi, K. (2022). Pushover analysis of the structure a 10-floor building with ATC-40. IJTI International Journal of Transportation and Infrastructure, 5(2), 110-116. https://doi.org/10.59900/ijti.v5i2.110
Zebua, D., & Koespiadi. (2022). Performance evaluation of high-rise building structure based on pushover analysis with ATC-40 method. Applied Research on Civil Engineering and Environment (ARCEE), 3(02), 54-63. https://doi.org/10.32722/arcee.v3i02.4334
Zebua, D., & Siswanto, I. (2023). Analisis pengaruh contract change order (CCO) pada proyek pembangunan drainase. Jurnal Penelitian Jalan dan Jembatan, 3(2). https://doi.org/10.59900/ptrkjj.v3i2.167
Zebua, D., & Wibowo, L. S. B. (2022). Effect of soil type on lateral displacement of reinforced concrete building. Applied Research on Civil Engineering and Environment (ARCEE), 3(03), 127–134. https://doi.org/10.32722/arcee.v3i03.4965
Zebua, D., & Wibowo, L. S. B. (2022). Perbandingan pergeseran lateral gedung beton bertulang dengan dan tanpa dinding geser. Racic: Rab Construction Research, 7(1), 11-19. Retrieved from https://univrab.ac.id
Zebua, D., & Wibowo, L. S. B. (2023). Pengaruh jenis tanah terhadap simpangan lateral gedung beton bertulang. Jurnal Riset dan Pengembangan Sumber Daya, 6(1), 1-10. https://doi.org/10.25139/jprs.v6i1.4901
Zebua, D., Harita, H., Daeli, S. D., Zalukhu, M. H., & Laia, B. (2024). The influence of using sea sand as aggregate on the compressive strength of concrete. Innovative Research in Civil and Environmental Engineering, 1(1), 1–6. https://doi.org/10.70134/ircee.v1i1.41
Zebua, D., Mendrofa, P. S. S., Telaumbanua, F. T., Mendrofa, R. W., & Laoli, P. J. (2024). Analisis statistika keandalan struktural dalam teknik sipil. Jurnal Ilmu Ekonomi, Pendidikan dan Teknik, 1(1), 28–37. https://doi.org/10.70134/identik.v1i1.241
Zebua, D., Prayoga, P., & Waruwu, P. C. E. (2023). Evaluasi dan desain pengembangan infrastruktur pengaliran drainase di wilayah Ngagel Tirto Kota Surabaya. Jurnal Penelitian Jalan dan Jembatan, 3(1), 26-32. https://doi.org/10.59900/ptrkjj.v3i1.134
Zebua, D., Putra, A. A. S., Wibowo, L. S. B., & Alfiani, S. (2023). Evaluation of seismic performance of hospital building using pushover analysis based on ATC-40. Journal of Civil Engineering, Science and Technology, 14(2). https://doi.org/10.33736/jcest.5326.2023
Zebua, D., Shofiyah, A., & Purnomo, H. D. (2023). Analisis desain kinerja model halte berdasarkan lingkungan di tempat terpilih. Jurnal Penelitian Jalan dan Jembatan, 3(1), 8-19. https://doi.org/10.59900/ptrkjj.v3i1.132
Zebua, D., Sulistiawati, M., Pratama, A. I., Rifani, R., & Razab, R. S. (2023). Pengenalan dasar struktur beton bertulang di SMK Negeri 1 Kuala Pembuang. Jurnal Pengabdian Kepada Masyarakat Jalan dan Jembatan, 1(01), 1-7. https://doi.org/10.59900/pkmtrkjj.v1i01.117
Zebua, D., Wibowo, L. S. B., Cahyono, M. S. D., & Ray, N. (2020). Evaluasi Simpangan Pada Bangunan Bertingkat Beton Bertulang berdasarkan Analisis Pushover dengan Metode ATC-40. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 3(2). https://doi.org/10.25139/jprs.v3i2.2475
Zebua, D., Wibowo, L. S. B., Cahyono, M. S. D., & Ray, N. (2020). Analysis pushover pada bangunan bertingkat beton bertulang 7 lantai menggunakan metode FEMA-356. Seminar Nasional Ilmu Terapan (SNITER) 2020, 4(1). https://doi.org/10.59900/ptrkjj.v3i1.133
Zebua, D., Wibowo, L. S. B., Rahman, H., & Rifani, R. (2022). Studi pengaruh peranan konsultan manajemen konstruksi pada proyek pembangunan tempat penyimpanan sementara limbah B3. Jurnal Penelitian Jalan dan Jembatan, 2(2), 1-8. https://doi.org/10.59900/ptrkjj.v2i2.81
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Laif Satoinong, Desnalia Desnalia, Steven Mintura, Wahyu Trifadil Paroipo, Abel Gulthom, Jawarta Simamora (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.